1.what is the Libya COI certification?
According to the regulations of the Central Bank of Libya in May 10th, all products exported to Libya shall be subject to product conformity certification before leaving shore. After obtaining the certification, the COI certificate will be issued, and the customs clearance bank shall show the COI certificate when the goods arrive in Libya for customs clearance. If the COI certificate is not obtained, the customs will refuse entry.
2.which products need COI certification?
1, food and agricultural products
2. Building and civil engineering materials
3, wood and wood products
4, oil and fuel
5, packing materials
6, electrical and electronic products
7, skin care products
8. Automotive and transportation products
9, clothing and textiles
10. Engineering equipment
11, machinery and equipment
12, toys, etc.
3.COI process:
1, application materials:
1) packing list and commercial invoice
2) product test report: issued by third party laboratory with ISO/IEC17025 CNAS qualification, also can answer
The factory ISO9001+ internal test report (see the specific name), except for sampling test.
3) COI application form: blank application form is provided by the management institution
4) product photos, packing photos, nameplates photos
2. arrange inspection:
1) audit documents: about 2 working days or so. After checking the OK, please confirm the inspection requirements (shipping marks) with us
Avoid unnecessary trouble during inspection.
2) inspection requirements (marks): General outer packing and products need to be printed with the following labels, the specific content of the actual product
Prevail:
Labeling requirements:
Brand name-
Model-
Manufacturer 's, name, and, address/, trademark-
Product description-
Country of manufacture
The main product inspection and packaging are above label content, can use adhesive paste.
3) confirm the inspection time and place: usually in the inspection requirements confirmed no problem within one week after inspection, in the cabinet before, without supervision.
Note: after A. has completed the on-site inspection, the inspector shall fill in the detailed inspection report immediately, indicating the problems found in the inspection and suggestions for rectification, etc., and leave a copy to the exporter. Each discrepancy reported in the discrepancy report should be immediately communicated to the exporter in order to attract its attention.
B. on-site inspection of the finished product does not mean that the conformity assessment process has been completed. The final conformity of the product shall be made by a comprehensive evaluation of the site inspection report, test report and relevant quality documents by the inspector.
4. charging standards: according to the value of the collection, the details of the consulting company!
5. the time of the COI certificate: after the inspection through, give us the final box invoice (customs boxes for foreign invoices), we issued confirmation in 3-4 working days, confirmed no problem COI certificate.