1.what is the Algeria COC/PVOC certification?
According to Algeria's central bank February 16, 2009 entry into force of the circular circular n. ~ 16/DGC/2009, the law of Algeria 0404 - 2004 Decree N ~ 05-465 fifteenth laws and sixteenth laws, and N ~ 05-467 twenty-sixth, all products imported to Algeria regulation must be attached by the authorized inspection and certification institutions issued by the compliance documents, in order to the goods are in conformity with technical regulations and standards in Algeria. All control products to Algeria have to be applied. Product conformity assessment certificate: CoC, used for customs clearance at Algeria port of destination.
2. which products need to apply for COC certification in Algeria?
All second-hand products
Food and agricultural products,
Chemical home products,
Textiles, footwear,
Toys,
Child care products,
Electronic and electrical products, etc..
3.Algeria: COC process
1, application materials:
1) packing list and proforma invoice
2) product test report: issued by the third party laboratory with ISO/IEC17025 CNAS qualification, also can accept the factory
ISO9001+ internal test report (see the specific name), except for the sampling test.
3) PVOC application form: blank application form is provided by the management institution
2. arrange inspection:
1) audit documents: about 2 working days or so. After checking the OK, please confirm the inspection requirements (shipping marks) with us
Avoid unnecessary trouble during inspection.
2) inspection requirements (mark): General outer packing and products need to be printed with the following labels, the specific content of the actual product shall prevail:
Labeling requirements:
Brand name-
Model-
Manufacturer name and address/ "s trademark-
Product description-
Country of manufacture
The main product inspection and packaging are above label content, can use adhesive paste.
3) confirm the inspection time and place: usually in the inspection requirements confirmed no problem within one week after inspection, in the cabinet before, without supervision.
Note: after A. has completed the on-site inspection, the inspector shall fill in the detailed inspection report immediately, indicating the problems found in the inspection and suggestions for rectification, etc., and leave a copy to the exporter. Each discrepancy reported in the discrepancy report should be immediately communicated to the exporter in order to attract its attention.
B. on-site inspection of the finished product does not mean that the conformity assessment process has been completed. The final conformity of the product shall be made by a comprehensive evaluation of the site inspection report, test report and relevant quality documents by the inspector.
4. charging standards: according to the value of the collection, the details of the consulting company!
5. the time of the COC certificate: after the inspection through, give us the final box invoice (customs boxes for foreign invoices), we send COC confirmation in 3-4 working days, confirm no problem COC certificate.